Wednesday, January 23, 2013

Back-Up Power System for the Campus

Contractors installed a new transformer, automatic switch, and associated high voltage cabling power poles to support a new campus back-up power system.  Electricians are currently replacing old wiring and new components have also been installed.  Housekeeping pads are being poured for the new generator controllers.

Replacing the Old Wires

No comments: