skip to main | skip to sidebar
California State University Channel Islands

Operations Planning and Construction Blog

Wednesday, September 5, 2012

Broome Fountain Repair

The Broome Library reflection Pond was cracking and leaking, Operations staff has repaired the cracks and loose concrete.
Broome Libary Fountain
Posted by OPC Blog at 11:54 AM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Search This Blog

Links

  • OPC Home

Blog Archive

  • ►  2013 (20)
    • ►  June (5)
    • ►  May (4)
    • ►  April (4)
    • ►  February (2)
    • ►  January (5)
  • ▼  2012 (53)
    • ►  December (4)
    • ►  November (6)
    • ►  October (6)
    • ▼  September (12)
      • Central Mall Conversion
      • Bell Tower HVAC Sound Attenuation
      • North Quad-Grand Salon Refresh
      • A9 Lot Conversion
      • Campus Back Up Power
      • El Dorado Hall Roof Replacement
      • A9 Lot Conversion
      • North Campus Parking Lot
      • Central Mall Renovation
      • El Dorado Main Electrical Panel Upgrade
      • CI Park Safety Upgrades
      • Broome Fountain Repair
    • ►  August (25)