Contractors are currently installing a new transformer, re-closer and infrastructure as required to support a new campus back up power system. Preparations are being made to change the control boxes.
![]() |
A Generators |
![]() |
A second Generator |
Mail Services Student Assistant, Jenny Arevalo |