Contractors installed a new transformer, automatic switch, and associated high voltage cabling power poles to support a new campus back-up power system. Electricians are currently replacing old wiring and new components have also been installed. Housekeeping pads are being poured for the new generator controllers.
|
Replacing the Old Wires |
No comments:
Post a Comment