skip to main
|
skip to sidebar
Operations Planning and Construction Blog
Wednesday, September 12, 2012
Campus Back Up Power
Contractors are installing a new transformer, re-closer, and infrastructure. It is required to support a new campus back up power system. Preparations are being made to connect the Campus Generators to the system.
Campus Power Lines
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Search This Blog
Links
OPC Home
Blog Archive
►
2013
(20)
►
June
(5)
►
May
(4)
►
April
(4)
►
February
(2)
►
January
(5)
▼
2012
(53)
►
December
(4)
►
November
(6)
►
October
(6)
▼
September
(12)
Central Mall Conversion
Bell Tower HVAC Sound Attenuation
North Quad-Grand Salon Refresh
A9 Lot Conversion
Campus Back Up Power
El Dorado Hall Roof Replacement
A9 Lot Conversion
North Campus Parking Lot
Central Mall Renovation
El Dorado Main Electrical Panel Upgrade
CI Park Safety Upgrades
Broome Fountain Repair
►
August
(25)
No comments:
Post a Comment